Construction & Evaluation
Construction & Evaluation (CE) focuses on construction contract administration and post-occupancy evaluation of projects. You should be able to demonstrate an understanding of and abilities in construction contract execution, construction support services (including construction observation and shop drawing or submittal review), payment request processing, and project closeout. In addition, candidates must also demonstrate an understanding and abilities in project evaluation of integrated building systems and their performance.
Passed 01/07/22
Study Recommendations
The exam is 3 hours, and 75 questions.
The exam is mostly multiple choices, and about 15% drag and place, hotspot, and calculation questions.
Knowledge of construction detail is required, especially masonry wall, roof and foundation details.
Specifications divisions are not tested, and straight forward questions are rare in exam.
Exam Contents
SECTION 1: Preconstruction Activities
Design-Bid-Build (DBB)
Owner signs a separate contract with Architect and Contractor
Often required for public project, it is likely to get the lowest price due to its competitive nature
Design-Build (DB)
Own signs a single contract with one design builder for both design and construction services
Reduce risk of schedule and cost overruns
Construction Manager as Advisor (CMa)
A separate party hired by owner
CMa controls cost and advise on constructability and construction schedule, reviews RFI + submittal and handles communications first
Construction Manager as Constructor (CMc)
CMc will advise architect constructability, schedule, complexed project, etc.
Usually during end of DD, will provide a Guaranteed Maximum Price (GMP) and construction schedule to be approved by Owner
Integrated Project Delivery (IPD)
Owner, Architect, Contractor, Advisor acts as a single entity
Bidding Procedure
Prequalification of bidders based on: financial report, personnel, experience, reference, size, bonding capability, quality of work.
Architect's role during bidding include publish bid document, answer bidder questions, assist owner to evaluate bids, etc.
Contractor requests substitution to be considered (10) days before due date, clarification (7) days before due date. Architect provides response or addenda (4) days before due date.
Bidding Documents
Invitation to bid, instruction to bidders (A701), supplementary instruction, bid forms, bid security, bonds.
Base Bid: contract amount of the base scope
Alternates: addition or deletion of elements
Unit Price: cost for portions of work based on individual quantity
Allowances: estimated cost to cover a equipment or element which the price has not yet been determined
SECTION 2: Construction Observation
Purpose of Observation
1. Become generally familiar with progress and quality of work
2. Guard owner against defects and deficiency
3. Determine whether work is progress with construction documents
Number and Time of Visit: determined by the architect or specified in the Owner-Architect agreement
Field Report: include name/project number, field report number, date/time/weather, current work, number of workers in the field, observation notes/photos, assessment of conformance, estimated completion
Uncovering and Correction of Work
Nonconformance - Contractor pays, but Owner can choose to accept nonconforming works
Requested by Architect, and conforms to CD - Owner pays
Requested by Architect, and NOT conforms to CD - Contractor pays
SECTION 3: Administrative Procedures & Protocols
Minor Changes in the Work
Minor change does not change contract sum and time
Change Order
Involves a change in contract sum and/or time. Need to be signed by Owner, Architect, Contractor
Construction Change Direction
Signed by Owner and Architect to direct Contractor to procced with changes, when Contractor is not in agreement with the contract sum and/or time.
Construction Submittals
Not part of the contract documents, turnaround time determined by submittal schedule
Shop Drawing/Sample/Product Data/Cut Sheet
Application for Payment
Architect approve or reject the requested amount based on Schedule of Values
Reason to withhold money: defective work, 3rd party claim, contractor's failure to pay subs, damages, work cannot be completed on time
Retainage is withheld until final completion to protect the owner, usually 10% of the contract sum
Dispute and Claims
Architect should try to clarify the contract scope and requirement impartially first when there is a conflict between Owner and Contractor
Architect is often the Initial Decision Maker (IDM)
Claim → IDM Resolution → Mediation → Arbitration/Litigation
SECTION 4: Project Closeout & Evaluation
Substantial Completion
Contractor prepares a Punchlist for the Architect to review during inspection
If all the essential elements are complete, Architect issues a Certificate of Substantial Completion
Owner can occupy the building for its intended use and warranties start
Post Occupancy Evaluation
Conducted 3-6 month after occupation, as an additional service
Data might be gathered from owner, user, visitor, occupants, etc.
Follow Up Visit
6-12 month after occupation, included in the basic service
A walk-through with Owner, provide evaluation and hear feedback